|
Re: Draft Flow Charts
8/4/2005 7:58:26 AM
(Total replies: 1)
|
| The non-residential program still needs more fine tuning, but it's definitely better than the initial program. With our business being highly custom, a more streamlined and cost effective approach is direly needed. Eliminating some of the redundant, and time consuming steps is a clear benefit to the manufacturers. As you know, for a project to maintain it's production schedule we must get through the process rather quickly. |
|
|
|
Re: Draft Flow Charts
8/26/2005 5:40:00 PM
(Total replies: 1)
|
| As a manufacturer we would like to see the role of the IA removed, and the standard changed to just a simulation being required from a lab. The primary concern is for an expeditious approach, we need to remove steps for the time element, and to alleviate more costs. |
|