Re: Draft Flow Charts
9/1/2005 2:53:25 PM
(Total replies: 0)
|
| Unitl we get more details drafted its hard to decide what oversight (third party- could be anyone, sim lab, NFRC staff or IA) is needed. If its a whole building does someone need to make sure every opening is accounted for, that the glass is right, that the sizes and quantities are right. If it's one product line who verifies that the right components were used in the calc. Will 5 inch and 7inch deep frames have the same ratings? Will 3" and 4 " high plates have the same rating? How much of ... |
|